Breadcrumb Home Public documents Public documents D1.2 ALFRED reference design and initiating events D1.3 MYRRHA reference design and initiating events D2.9 Design description for the wire-wrapped rod bundle water experiments D5.1 LFR BOP Configurations analysis: definition of the final system configuration, equipment specifications and balance of plant D5.2 LFR BOP Main components definition: definition and sizing of the main components, including sensitivity analysis of both BOP configurations D6.1 Plan for the Exploitation and Dissemination of Results (PEDR) D6.3 Newsletter 1 Share this page